Primary DC Migration Evaluation and Management Consultancy
The IDT team was awarded the task of Evaluating the existing CDB Data Center Infrastructure, and the formulation of a Requirement List for the Migration of the Data Center to a Co-Location Facility (including Selection and Evaluation of the benefits of this movement, and prepare the Financial Considerations of Co-Location Hosting CDB) along with the Migration Strategy and Management.
Task
Existing Data Center Evaluation, Co-Lo Requirement and Migration Strategy Formulation and Management